Roofing pvdf shade tent membrane structure architecture

Roofing pvdf shade tent membrane structure architecture

Completion Time
April, 2017
Construction Site
Saudi Arabia
Brand
Yuehong
Project Area
400 Square Meters
Structure Selection
Main Structure adopts Q235 Steel Pipe
Warranty
More than 15 years
Delivery Time
Within 25 Days after confirm deposit
Film Type
White PVDF architectural film imported from Germany, Total Weight 1000g/㎡, Thickness is 0.95mm.
Payment
T/T, VISA, Master Card, E-checking, L/C, Cash (30% deposit, 70% balance before delivery)
Place of Origin
China Guangzhou
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:



Project Description
Membrane Structure


  •  

    In April 2017, we successfully completed the construction of the membrane structure added to the roof of a well-known hotel in Saudi Arabia, adding a dazzling brilliance to the local area.

  •  

    The local environment is relatively harsh and there are often sandstorms. Our designers have tailored a local film structure scheme to suit this point, which not only resists dust storms but also has light transmission and sealing properties. With the self-cleaning function, you don't have to worry about being covered by dust and causing unnecessary trouble.

  •  

    This type of styling is suitable for sunshades in sports stands, hotel atrium ceilings, sports plazas, outdoor pavilions, and commercial streets. The shape is simple and generous, with different styles.


Material Parameter
Membrane Structure


  Parameters 
  

Project Area: 400 Square Meters;
Structure Selection: Main Structure adopts Q235 Steel Pipe;
The steel pipe is a high-frequency welded pipe, the material is Q235, and the welding rod is E43 type.
The membrane material is PVC architectural membrane material, the color is white.
The pre-embedded steel plate is Q235 steel.


Product Installation
Membrane Structure


                           
1
Installation-1
Appearance inspections are performed on all weld locations. The visual inspection level is Class B.
                           
2
Installation-2
Rust removal is applied at the surface of all components and the rating is St3.
                           
3
Installation-3
All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.
                           
4
Installation-4
Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.
                           
5
Installation-5
Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.
                           
6
Installation-6
Reasonably arrange the installation sequence of steel structure and membrane structure.