PVDF/PTFE/ETFE membrane structure car parking shed commercial

PVDF/PTFE/ETFE membrane structure car parking shed commercial

Completion Time
May, 2015
Construction Site
New Studios Casino, Macao
Brand
Yuehong
Project Area
2500 Square Meters
Structure Selection
Main Structure adopts Q235 Steel Pipe
Warranty
More than15years
Delivery Time
Within 25 Days after confirm deposit
Film Type
White PVDF architectural film imported from Germany, Total Weight 1000g/㎡, Thickness is 0.95mm
Payment
T/T, VISA, Master Card, E-checking, L/C, Cash (30% deposit, 70% balance before delivery)
Place of Origin
China Guangzhou
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:



Project Description
Membrane Structure


  •  

    The site of the project is located in the parking lot of the New Studios Casino in Macao. Both sides of the entrance are equipped with a double-cap inverted structure, which has a strong momentum. The column structure uses square cylinder steel column building materials and is not easily damaged. The overall effect of the customer when the production is completed is very satisfactory.

  •  

    This type of styling is suitable for awnings such as sports stands, sunshades, sports plazas, residential entrances, and commercial streets. The styling is simple and generous, and its styles are different.


Design Load & Material Parameter
Membrane Structure


  Design Load
  

Live Load: 0.30kn/m2;
Basic Snow Pressure: 0.10kn/m2;
Lifespan: 15 years.
Basic Air Pressure: 0.40 kn/m2;
Pre-tension of the Film Warp/weft=2.0/2.0 kn/m.


Material Parameter

 ◪ 1.All the steel pipes used are hot-pressed seamless steel pipes. All the main materials are Q235 steel, in line with GB700-88.

 ◪2.The pipe-to-pipe connection and pipe-to-connector connection use a butt weld or full-period fillet weld.

  3.All butt welds must be cut-through welds. These welds are not specified and the weld grade is Grade 3.

  4.Where the weld is not a fillet weld, the weld foot is not less than 4mm. All exposed mouths have sealing plates.

  5.Bolts are galvanized common large hex head bolts, in line with GB5780-86; nuts in line with GB41-86.

  6.The membrane fabric is made of PVC membrane material with PVDF coating on the surface.

  7.The wire rope material conforms to the universal wire rope standard "GB/T8918-196" and its surface is galvanized.


Macau carport - side view
Macau Carport - Floor Plan
Macau carport - axonometric map


Product Installation
Membrane Structure


  •  

    Appearance inspections are performed on all weld locations. The visual inspection level is Class B.

  •  

    Rust removal is applied at the surface of all components and the rating is St3.

  •  

    All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.

  •  

    Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.

  •  

    Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.

  •  

    Reasonably arrange the installation sequence of steel structure and membrane structure.