Park Entrance-Exit Steel Membrane Structure Awning

Park Entrance-Exit Steel Membrane Structure Awning

Completion Time
October, 2017
Construction Site
Tianhe Science Park, Guangzhou, Guangdong Province
Brand
Yuehong
Project Area
1500 Square Meters
Structure Selection
Main Structure adopts Q235 Steel Pipe
Warranty
More than 15 years
Delivery Time
Within 25 Days after confirm deposit
Film Type
White PVDF architectural film imported from Germany, Total Weight 1000g/㎡, Thickness is 0.95mm.
Payment
T/T, VISA, Master Card, E-checking, L/C, Cash (30% deposit, 70% balance before delivery)
Place of Origin
China Guangzhou
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:



Project Description
Membrane Structure


  •  

    The project site is located in Guangzhou Tianhe Science Park, which belongs to the film structure of the door and aisle corridor, and has the functions of shading, retaining water and beautifying aisles. In addition, the membrane structure of the entrance is made using the slope shape of the slope, wherein the diameter of the column is up to 5 meters, and the height can be entered into an ordinary large-scale fire engine. Membrane material is imported film material, the overall structure is stable and durable, the shape is very consistent with the momentum of science and technology park.

  •  

    This type of styling is suitable for awnings such as sports stands, sunshades, sports plazas, residential entrances, and commercial streets. The styling is simple and generous, and its styles are different.


Material Parameter
Membrane Structure


  Parameters 
  

Project Area: 1500 Square Meters;
Structure Selection: Main Structure adopts Q235 Steel Pipe;
The steel pipe is a high-frequency welded pipe, the material is Q235, and the welding rod is E43 type.
The membrane material is PVC architectural membrane material, the color is white.
The pre-embedded steel plate is Q235 steel.


Product Installation
Membrane Structure


                           
1
Installation-1
Appearance inspections are performed on all weld locations. The visual inspection level is Class B.
                           
2
Installation-2
Rust removal is applied at the surface of all components and the rating is St3.
                           
3
Installation-3
All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.
                           
4
Installation-4
Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.
                           
5
Installation-5
Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.
                           
6
Installation-6
Reasonably arrange the installation sequence of steel structure and membrane structure.