Home  > Projects  > Sports Membrane Structure  >  High tensile fabric pvdf architectural membrane structure canopy for swimming pool
High tensile fabric pvdf architectural membrane structure canopy for swimming pool

High tensile fabric pvdf architectural membrane structure canopy for swimming pool

Completion Time
May, 2015
Construction Site
Guangzhou
Brand
Yuehong
Project Area
3000 Square Meters
Structure Selection
Main Structure adopts Q235 Steel Pipe
Warranty
More than 15 years
Delivery Time
Within 25 Days after confirm deposit
Film Type
White PVDF architectural film imported from Germany, Total Weight 1000g/㎡, Thickness is 0.95mm
Payment
T/T, VISA, Master Card, E-checking, L/C, Cash (30% deposit, 70% balance before delivery)
Place of Origin
China Guangzhou
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:



Project Description
Membrane Structure


  •  

    The project site is located in Guangzhou Aolongbao indoor sports swimming pool, the structure is the use of double isolation effect, the use of double membrane, the inner membrane has a good seal, thermal insulation effect, the outer mold structure on the full sense of style, The surface is concave and convex. The overall shape is magnificent, atmospheric and magnificent.

  •  

    This type of styling is suitable for sports stands shade, sports plaza, large swimming pools and other buildings, modeling can be produced according to customer requirements.


Material Parameter
Membrane Structure


  Parameters 
  

1.All the steel pipes used are high-frequency welded pipes, all the components are made of Q235, in line with GB700-88.
2.The connection between the pipe and the pipe and the connection between the pipe and the connecting piece adopts butt welds or full circumferential welds.
3.All butt welds must be cut-through welds. These welds are not specified and the weld grade is Grade 3.


4.Where the weld is not a fillet weld, the weld foot is not less than 4mm. All exposed mouths have sealing plates.

5.Bolts are galvanized ordinary large hex head bolts, in line with GB5780-86. The nut meets GB41-86.

6.The membrane fabric is made of PVC membrane material with PVDF coating on the surface.

7.The wire rope material conforms to the universal wire rope standard "GB/T8918-196" and its surface is galvanized.


Swimming pool membrane construction drawing - side view
Swimming pool membrane construction drawing - elevation


Product Installation
Membrane Structure


                           
1
Installation-1
Appearance inspections are performed on all weld locations. The visual inspection level is Class B.
                           
2
Installation-2
Rust removal is applied at the surface of all components and the rating is St3.
                           
3
Installation-3
All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.
                           
4
Installation-4
Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.
                           
5
Installation-5
Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.
                           
6
Installation-6
Reasonably arrange the installation sequence of steel structure and membrane structure.



Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...